Geothermal energy in the Bleiswijk region
%20website.png)
Start of drilling operations at Petuniaweg
Drilling operations will commence in August 2026 at the site on Petuniaweg in Bleiswijk. The project is being carried out by Gaia Energy on behalf of IPS Geothermal Energy B.V. and 85 Degrees Renewable, focusing on supplying geothermal heat to a local geothermal heating network for greenhouse horticulture located on Petuniaweg and Hyacintenweg (Overbuurtse Polder). This area will subsequently be connected to the geothermal cluster in Noordpolder (both in the municipality of Lansingerland).
Bleiswijk Geothermal Cluster: Development and Collaboration
In the Bleiswijk and Noordpolder geothermal cluster in Berkel en Rodenrijs, Gaia Energy is developing multiple geothermal projects on behalf of permit holders IPS Geothermal Energy B.V. and 85 Degrees Renewable. Recent projects, such as those on Petuniaweg and Verweijweg, provide sustainable heat to greenhouse horticulture businesses in the area. With additional permit applications underway, further expansion of the geothermal heat supply is being pursued at both locations. This includes the development of new doublets and associated heating networks for greenhouse horticulture clusters in Bleiswijk, Berkel en Rodenrijs, and Bergschenhoek (municipality of Lansingerland), collectively known as the B3Hoek area.
Collaboration and project structure
The Bleiswijk area (including Noordpolder) is a key geothermal cluster in South Holland that has been committed to geothermal energy for greenhouse horticulture for years. The original start-up permit has been split into Bleiswijk II and Bleiswijk III, with IPS Geothermal Energy B.V. and 85 Degrees Renewable B.V. as the license holders. Gaia Energy acts as the executor and operator of the drilling and implementation. In 2024, a total of five wells were drilled and completed within the search area, distributed across the sites at Petuniaweg and Verweijweg. This has led to the realization of three doublets:
Petuniaweg: - Bleiswijk II: VDB-GT-101 and VDB-GT-02*
Verweijweg: - Bleiswijk 1b: VDB-GT-05 and VDB-GT-06
- Zoetermeer I: VDB-GT-07 and VDB-GT-08
These doublets represent a significant step toward large-scale and reliable geothermal production in the region. One of the most recent projects is the Verweijweg site, which is currently in the testing phase.
* This concerns the existing geothermal well (2007). The drilled well VDBGT-101 is the new production well replacing VDB-GT-01. The old production well VDB-GT-01 has been out of service since 2021 and will be fully abandoned this year.
Sustainable heat for greenhouse horticulture
Through these developments, Gaia Energy provides sustainable, continuous, and low-CO₂ heat to the greenhouse horticulture sector in the area. Geothermal energy helps growers reduce their dependence on fossil fuels and contributes to a future-proof sector.
Gaia Energy has realized multiple projects within this area and is responsible for both the execution and operational management. In this role, we ensure the safe, efficient, and reliable use of geothermal energy for the long term. Together with our partners, we are building a robust and sustainable heat supply for greenhouse horticulture in the municipality of Lansingerland.
More projects
Innovative solutions for sustainable energy
Get in touch withGaia Energy
Do you have any questions or would you like to start a project? We are ready to help you!






